Site Induction Checklist Builder

Complete 4 quick steps — get a custom, print-ready WHS site induction checklist tailored to your project.

1Project
2State & Site
3Work Types
4Hazards

Project details

This information populates the induction document header. All fields optional except company name.

Please enter your company name

State and site type

Your state determines which regulator contact, legislation reference, and state-specific requirements appear in the checklist.

Please select your state or territory

Work types on site

Select every type of work being carried out on this site. Any HRCW activity adds a dedicated checklist module with SWMS requirements. Skip this step if no specialised work applies.

HRCW = High-Risk Construction Work. These activities require a SWMS to be prepared before work begins under the model WHS Regulations. Selecting them adds specific induction items and confirms SWMS review as part of the induction.

Site-specific hazards

Add any hazards specific to this site not covered by the work types above. Each hazard becomes a dedicated checklist item. Leave blank if no additional hazards apply.

Examples: overhead powerlines (22kV) adjacent to north boundary · unexploded ordnance risk — area was former industrial site · heritage fabric — manual tools only in section B · shared access road with active quarry trucks