Free · All States · Printable · No Signup
Complete 4 quick steps — get a custom, print-ready WHS site induction checklist tailored to your project.
This information populates the induction document header. All fields optional except company name.
Your state determines which regulator contact, legislation reference, and state-specific requirements appear in the checklist.
Select every type of work being carried out on this site. Any HRCW activity adds a dedicated checklist module with SWMS requirements. Skip this step if no specialised work applies.
HRCW = High-Risk Construction Work. These activities require a SWMS to be prepared before work begins under the model WHS Regulations. Selecting them adds specific induction items and confirms SWMS review as part of the induction.
Add any hazards specific to this site not covered by the work types above. Each hazard becomes a dedicated checklist item. Leave blank if no additional hazards apply.
Examples: overhead powerlines (22kV) adjacent to north boundary · unexploded ordnance risk — area was former industrial site · heritage fabric — manual tools only in section B · shared access road with active quarry trucks